B. Connections and Wiring
8. Complete visual inspection of electrical connections and wiring.
9. Complete mechanical inspection of connections and wiring.
10. Measure torque of all electrical connections and re-torque as needed.
11. Complete thermal scan of inverter connections, wiring and electronics.
C. Testing
12. Conrm the inverter operating modes including standby, startup and on.
13. Check operation of protective circuits and alarms.
14. Validate display data accuracy.
D. Repair or Replace
15. Repair or replace items that have been determined to be near the end of their use-
ful life.
E. Reporting
16. Complete preventative maintenance report and recommendation.
F. Documentation of Annual Preventative Maintenance Checklist
Complete the maintenance checklist included in Appendix E and save the
information for your records. This checklist is also available on the
www.pvpowered.com web site.
Maintaining the Blower Intake Filters
PV Powered recommends an annual inspection and cleaning of the blower intake lters.
Cleaning may be required more often depending on the location of the inverter.
The air intake hood is mounted on gas shocks. It must be in the open position to clean the
lters.
1. Using a at-head screwdriver, turn each of the four retainer tabs a quarter turn. The
air intake hood can now be lifted to the open position.