Troubleshooting SMA Solar Technology AG
38 SB25_30-IEN092520 Installation Guide
9.1.2 Checking the Function of the Varistors
Varistors are wearing parts. Their functioning becomes restricted through aging or due to repeated
responses as a result of overvoltages It is therefore possible that one of the thermally monitored
varistors has lost its protective function, and thus the red LED is lit.
Check the function of the varistors as described below:
1. Open the Sunny Boy as described in section 7.1 "Opening the Sunny Boy" (page32).
2. With the aid of a multimeter, determine for both
varistors in the installed state whether a conductive
connection exists between connectors B and C.
Position of varistors
The position of the varistors can be determined with the help of the diagram below.
Observe the following allocation of the terminals:
Terminal A: outer terminal (varistor
connection with loop [crimp])
Terminal B: middle terminal
Terminal C: outer terminal (varistor
connection without loop [crimp])
Result Measure
☑There is a conducting connection. There is probably another fault in the Sunny Boy.
Close the Sunny Boy as described in section
7.2 "Closing the Sunny Boy" (page33).
Contact the Serviceline (see section 13 "Contact"
(page47).